D200 Distillery

 

 

Complete distillery,with 2 100kg vats, operated by a 150KVH firewood-boiler.

The equipment is sold already assembled, remaining only the hidraulic connections to be done, and it will be ready for operation.

The installation place for D200 should provide a support for the boiler and distillery. For each operation will be necessary room to shelter the equipment and about 2000L/hour water outflow for cooling, which can be supplied from a river, well, etc.

The water can be reused, as most of it will only be used for cooling. The boiler contains an injector, which uses it’s own steam for loading, replacing the need for electricity.

If necessary, Linax will provide a technician for delivery, installing and training on the equipment.

 

 

For further information and international sales, contact us.